Subaru Legacy

since 1990-1998 release

Repair and operation of the car



Subaru of Legasi
+ 1.1. Identification numbers
+ 2. Maintenance
- 3. Engines
   3.1. Technical characteristics
   3.2. Operations on repair of the engine installed in the car
   3.3. Top dead point of the first cylinder
   3.4. Cover of a head of the block of cylinders
   3.5. Inlet collector
   + 3.6. Gear belt and pulleys
   3.7. Replacement of a forward sealing ring of a cranked shaft
   3.8. Replacement of sealing rings of camshafts
   3.9. Camshafts and pushers
   3.10. Heads of the block of cylinders
   3.11. Oil pallet
   3.12. Oil pump
   3.13. Drive flywheel / plate
   3.14. Replacement of a back sealing ring of a cranked shaft
   3.15. Suspension bracket of the power unit
   - 3.16. Capital repairs of the engine
      3.16.1. Technical characteristics
      3.16.2. Check of a compression
      3.16.3. Check of the engine by means of the vacuum gage
      3.16.4. Recommendations about removal of the engine
      3.16.5. Removal of the engine
      3.16.6. Sequence of dismantling of the engine
      3.16.7. Dismantling of a head of the block of cylinders
      3.16.8. Cleaning and survey of a head of the block of cylinders
      3.16.9. Assembly of a head of the block of cylinders
      3.16.10. Removal of pistons
      3.16.11. Division of sections of blocks of cylinders
      3.16.12. Removal of a cranked shaft with rods
      3.16.13. Block of cylinders of the engine
      3.16.14. Honingovaniye of cylinders
      3.16.15. Rods
      3.16.16. Cranked shaft
      3.16.17. Survey of radical and shatunny bearings
      3.16.18. Balance of assembly of the engine at capital repairs
      3.16.19. Survey of pistons
      3.16.20. Check of working gaps of shatunny bearings
      3.16.21. Check of working gaps of radical bearings of a cranked shaft
      3.16.22. Assembly of sections of the block of cylinders
      3.16.23. Installation of piston rings
      3.16.24. Installation of pistons
      3.16.25. Installation of the engine
      3.16.26. Start of the engine after capital repairs
+ 4. Heating, ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Systems of start, ignition
+ 8. Transmissions
+ 9. Coupling, shaft
+ 10. Brake system
+ 11. Suspension bracket
+ 12. Steering
+ 13. Body
+ 14. Electric equipment


3a942d17 Рисунки на коробке для пиццы подробности здесь.

3.16.12. Removal of a cranked shaft with rods

PERFORMANCE ORDER
1. Remove a back sealing ring of a cranked shaft.
2. Before removal of a cranked shaft measure its axial side play with use of the probe for what move a cranked shaft of the engine to back part of the engine.
3. For definition of a side play of a cranked shaft measure a gap between a persistent surface of the central radical bearing and a cranked shaft (1 – a probe edge, 2 – a cranked shaft).
4. Remove a cranked shaft from the block of cylinders of the engine.
5. Remove radical inserts of a cranked shaft from the block of cylinders of the engine.