Subaru Legacy

since 1990-1998 release

Repair and operation of the car



Subaru of Legasi
+ 1.1. Identification numbers
+ 2. Maintenance
- 3. Engines
   3.1. Technical characteristics
   3.2. Operations on repair of the engine installed in the car
   3.3. Top dead point of the first cylinder
   3.4. Cover of a head of the block of cylinders
   3.5. Inlet collector
   + 3.6. Gear belt and pulleys
   3.7. Replacement of a forward sealing ring of a cranked shaft
   3.8. Replacement of sealing rings of camshafts
   3.9. Camshafts and pushers
   3.10. Heads of the block of cylinders
   3.11. Oil pallet
   3.12. Oil pump
   3.13. Drive flywheel / plate
   3.14. Replacement of a back sealing ring of a cranked shaft
   3.15. Suspension bracket of the power unit
   - 3.16. Capital repairs of the engine
      3.16.1. Technical characteristics
      3.16.2. Check of a compression
      3.16.3. Check of the engine by means of the vacuum gage
      3.16.4. Recommendations about removal of the engine
      3.16.5. Removal of the engine
      3.16.6. Sequence of dismantling of the engine
      3.16.7. Dismantling of a head of the block of cylinders
      3.16.8. Cleaning and survey of a head of the block of cylinders
      3.16.9. Assembly of a head of the block of cylinders
      3.16.10. Removal of pistons
      3.16.11. Division of sections of blocks of cylinders
      3.16.12. Removal of a cranked shaft with rods
      3.16.13. Block of cylinders of the engine
      3.16.14. Honingovaniye of cylinders
      3.16.15. Rods
      3.16.16. Cranked shaft
      3.16.17. Survey of radical and shatunny bearings
      3.16.18. Balance of assembly of the engine at capital repairs
      3.16.19. Survey of pistons
      3.16.20. Check of working gaps of shatunny bearings
      3.16.21. Check of working gaps of radical bearings of a cranked shaft
      3.16.22. Assembly of sections of the block of cylinders
      3.16.23. Installation of piston rings
      3.16.24. Installation of pistons
      3.16.25. Installation of the engine
      3.16.26. Start of the engine after capital repairs
+ 4. Heating, ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Systems of start, ignition
+ 8. Transmissions
+ 9. Coupling, shaft
+ 10. Brake system
+ 11. Suspension bracket
+ 12. Steering
+ 13. Body
+ 14. Electric equipment


3a942d17

3.16.24. Installation of pistons

GENERAL INFORMATION

The correct arrangement of pistons before installation of internal lock rings of a piston finger


PERFORMANCE ORDER
1. Install the engine on a workbench in the same situation as it is and in the car.
2. Establish new lock rings of a piston finger in an internal flute of a piston finger of each piston (see rice. The correct arrangement of pistons before installation of internal lock rings of a piston finger).
3. Check that locks of piston rings are correctly located on the piston. Grease a skirt of the piston and piston rings with pure engine oil. Using the adaptation for compression of piston rings, squeeze piston rings on the piston of the first cylinder.
4. Turn a cranked shaft of the engine so that rods of the first and second cylinders were established in the lower dead point. Establish the top heads of rods precisely on the center of the cylinder.
5. Insert the piston with the adaptation squeezing rings into the top part of the first cylinder. Thus the inscription of UP or TOP has to be directed up.
6. Using wooden whetstone or the handle of a hammer, press the piston into the cylinder.
7. Move the piston until the opening in the piston under a piston finger is not combined with an opening in the top head of a rod. Openings under a piston finger are visible through a technological opening in the block of cylinders. If necessary, using a core of the corresponding diameter, level openings under a piston finger.
8. Oil a piston finger pure engine and install it through a technological opening in the piston and a rod.
9. Install an external lock ring of a piston finger in the piston.
10. Similarly install the piston of the second cylinder. Apply a thin film of sealant on laying of a technological stopper and install laying and traffic jams in the block of cylinders.
11. Turn a cranked shaft of the engine so that rods of the third and fourth cylinders were established in the lower dead point.
12. Repeat operation on installation of pistons and piston fingers of the third and fourth cylinders.